The 4D system

Four doors. Four signatures.

Every LB Construction project moves through four gated stages. Each gate ends in a signed document. Nothing advances until both sides agree it should.

01

Discover

21 Days

Site visit, brief deep-dive, feasibility study, indicative BOQ.

  • Site soil & access survey
  • Statutory feasibility report
  • Indicative budget bands
  • Architect chemistry session
02

Design

4–8 weeks

Architecture, structure, MEP, interior layouts and the locked BOQ.

  • 3 design directions
  • 1:1 VR walkthrough
  • Material library curation
  • Locked, line-item BOQ
03

Deliver

8–12 months

Site execution under our 6-checkpoint quality system and weekly reporting.

  • Dedicated PM + site engineer
  • 6 quality inspections per floor
  • Weekly photo + spend report
  • Snag-walk before handover
04

Dwell

Lifetime

Handover, 12-month defects liability, 5-year structural warranty, lifetime advisory.

  • Detailed handover dossier
  • 12-month snag-resolution
  • 5-year structural warranty
  • Annual maintenance plan (optional)